Go back

Genoa's New Breakwater in 3D

VIDEO

#PROJECTS
Genoa's New Breakwater in 3D

Genoa's New Breakwater is an impressive and one-of-a-kind engineering feat: its foundation will rest on a seabed that reaches a record depth of 50 meters, and in its final configuration will reach an overall length of 6,200 meters. 

Genoa is set to strengthen its role as a strategic hub for the Mediterranean. 

Find out more

Genoa's New Breakwater in 3D

Information material - Bridge project over the Strait of Messina
(*) Required information