Videonews Murales #3

The third work unveiled at Piazza Venezia

Murales - La terza opera nel cantiere di Piazza Venezia

05/12/2025 - Rome is building its future: at Piazza Venezia, Metro Line C’s Venezia station rises eight levels underground.

The Murales project transforms the site’s ten silos into public art, with Elisabetta Benassi’s "Tools" portraying the hands of realworkers and blending history, labor, and symbolism.

Led by Webuild and Vianini Lavori, the Metro C Consortium shows how infrastructure and art can meet, connecting the city’s past, present, and future.

Find out more

Videonews Murales La terza opera in cantiere a Piazza Venezia
Information material - Bridge project over the Strait of Messina
(*) Required information