The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Jorf Lasfar Thermal Power Plant - Units 3 & 4

AIRPORTS, CIVIL AND INDUSTRIAL CONSTRUCTION

#INDUSTRIAL BUILDINGS
Project's overview
Civil and Industrial Buildings

Morocco

Completed
Jorf Lasfar Thermal Power Plant - Units 3 & 4

The contract involves the construction of all the civil engineering works for the building of units 3 & 4 of the Jorf Lasfar thermal power plant, with the installation of 2 320-MW generator units in addition to the two existing units (Units 1 & 2).

The works carried out under the scope of the contract have been:

  • Chimney with external concrete chimney shaft with an overall height of 130 m, internal diameter of 12.55 m, including the two internal refractory rods with a diameter of 4.40 m.
  • Concrete ash deposit silos with an internal diameter of 12.55 m, 35 m tall.
  • Machine room building with the main structure in reinforced concrete.
  • Concrete support structure for the turbo-alternator units.
  • Foundations for the boilers and water storage tanks.
  • Foundations for the transformers and electrofilters.
  • Extension of the coolant water pumping and demineralisation buildings.
  • Drains, sanitary sewers, trenches and cable trays.
  • Foundations for coal conveyor belts and ash disposal.
  • Various roads and piazzas.
  • Metalwork for the construction of the machine room building’s covering, coal conveyor belts to be used for supplying the boilers and various metal structures.
  • Extension of the coal storage areas, including the related support structures for moving the coal.

MAIN TECHNICAL DATA:

Excavations: 140,000 m³

Concrete:  65,000 m³

Steel reinforcements: 4,700 tons

Metalwork: 2,000 tons

Jorf Lasfar Thermal Power Plant - Units 3 & 4