Go back

Ulu Jelai Hydroelectric Project

DAMS, HYDROELECTRIC POWER PLANTS

#HYDROELECTRIC PLANTS
# DAMS
#MALAYSIA
Project's overview
Dams, hydroelectric power plants

Malaysia

Completed

The project is located approximately 200 Km north of Kuala Lumpur, in the state of Pahang.

The main component was the construction of the Susu dam on the Bertram River, more than 80 metres high and constructed entirely using RCC (roller compacted concrete) technology, with a total volume of about 750,000 m3. In addition to the dam, the project involved the construction of an underground plant, equipped with two Francis turbines with a power output of 191 MW each and the construction of approximately 26 Km of hydraulic tunnels, of which approximately 15 Km excavated with Tunnel Boring Machines (TBM) and the remaining with the traditional method. The installed power of the system is 382 MW.

KPI

Technical data

+ + +

m height

+ + +

m in length

+ + +

m3 of excavation and earthmoving

+ + +

m3 of underground rock excavation

+ + +

m3 volume concrete works

+ + +

m3 dam volume in RCC

+ + +

m3 dam volume in RCC

Insights

Ulu Jelai: Green Energy for Malaysia

Ulu Jelai Hydroelectric Project

Information material - Bridge project over the Strait of Messina