183A Tollway Project, Phase III

HIGHWAYS, ROADS AND BRIDGES

#USA
# ROADS
# BRIDGES
Project's overview
Roads and Highways

USA

Completed
183A Tollway Project, Texas, USA

The 183A Extension Phase III Project included construction of two tolled lanes for 6.6 miles in each direction from Hero Way to north of SH 29. It also foresaw a shared use path from Hero Way to the proposed Seward Junction. The extension of 183A toll Road included the construction of 17 bridges, two of which over the South Fork San Gabriel River.

With unprecedented growth in Williamson County, especially in Cedar Park, Leander and Liberty Hill, traffic volumes along the 183 are seen increasing by 183% during the next 25 years. The project helps alleviate future traffic congestion and reduce driving times for commuters.

Contractor: Lane Construction Corporation (Webuild Group)

Read more on Lane website

183A Tollway Project, Texas, USA

1 /0
183A Tollway Project, Phase III
Information material - Bridge project over the Strait of Messina
(*) Required information
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.