The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

I-4 and Sand Lake Road Interchange Improvements

HIGHWAYS, ROADS AND BRIDGES

Project's overview
Roads and Highways

USA

In progress
I-4 and Sand Lake Road Interchange Improvements - Webuild

The I-4 and Sand Lake Road Interchange Improvements Project will increase capacity, mobility, and safety at the interchange Sand Lake Road and I-4 in Orange County, Florida (USA). 

The project entails roadway improvements and preparations to install a Diverging Diamond Interchange (DDI) with I-4. There is also the replacement of two bridges, the construction of a new bridge for preferential lanes, three new access ramps, as well as the installation of toll and signaling systems. Once completed, the revamped interchange will help minimise travel times and decrease the wait time at traffic signals.

The interchange is part of Orlando’s popular tourist corridor that connects attractions including Universal Studios Orlando, International Drive, Sea World, and Walt Disney World. Improvements to the interchange will contribute to the local economy by easing traffic flow, cutting travel times and reducing excess emissions of CO2.  

 
 

Technical Details:

  • Widening over 6km of tolled lanes
  • Reconfiguring interchange to a Diverging Diamond (DDI)
  • Two bridge replacements
  • One new bridge
  • New traffic signals

 

Benefits/Positive Aspects to Community:

  • Improve driver safety
  • Reduce travel times
  • Reduce C02 emissions from idling vehicles 
     

Contractor: The Lane Construction Corporation (U.S. subsidiary of the Webuild Group)

 

Sand Lake Road project

Information material - Bridge project over the Strait of Messina
(*) Required information