Improvement of the I-77/I-40 Interchange, North Carolina

HIGHWAYS, ROADS AND BRIDGES

#MOTORWAYS
#USA
Project's overview
Roads and Highways

USA

Completed
I-40 USA

The project to improve the I-77/I-40 Interchange, Iredell County, North Carolina, included the widening from four lanes to eight for about 7.4 miles (11.91 kilometres) and involved improving the system connection by designing and building a partial turbine interchange.
Works were divided between the two interstates as follows:

I-77

  • Widening of I-77 for approximately 3.6 miles – median barrier separated
  • Interchange modification at Broad Street
  • New dual bridges at I-77 over I-40
  • New bridges at I-77 over Fourth Creek; US-64 over I-77; and Broad Street over I-77 in Statesville
  • Two new ramp bridges over I-77 at the turbine interchange

I-40

  • Widening of I-40 for approximately 4.0 miles – median barrier separated
  • Bridge widening of I-40
  • New bridge on I-40 over Fourth Creek Tributary
  • Bridge demolition, existing bridges on I-40 over closed ramp from US64

Contractor: The Lane Construction Corporation (U.S. subsidiary of the Webuild Group)

Technical data

+ + +

km of length

+ + +

new bridges

+ + +

lanes

I-77 - I-40 interchange, USA, North Carolina