The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

SR 408/SR 417 Interchange Improvements, Florida

HIGHWAYS, ROADS AND BRIDGES

#MOTORWAYS
#USA
Project's overview
Roads and Highways

USA

Completed
Interchange Florida

The SR 408/SR 417 interchange in Central Florida is one of the largest and most heavily traveled interchanges linking northeast Orlando and downtown.

The interchange connects Seminole County and East Orange County to Downtown Orlando, and provides a direct route to the Orlando International Airport from the north as well as alternative access to area tourist attractions.

This project was needed to reduce peak-time traffic congestion and improve traffic flow at the intersection of SR 408/SR 417. Work included the widening of SR 408 from six to eight lanes (four in each direction); the elimination of exit and entrance ramps at Valencia College Lane; and the construction of a new two-lane ramp from eastbound SR 408 to northbound SR 417.

The complexity of the interchange required the design and construction of numerous bridge types, each appropriate for its location and purpose on the site. This ensured the effective movement of traffic while controlling construction costs.

Five overhead signs were installed that meet newly adopted guidelines in the Manual on Uniform Traffic Control Devices. Some of the first in Florida, these massive signs guided motorists to upcoming lane assignments. Nearly 13,000 linear feet of soundwalls were also installed, including the first transparent bridgemounted noise barriers in Florida.

The project was completed ahead of schedule while maintaining the interchange flow of 170,000 vehicles per day on SR 408 and 130,000 vehicles per day on SR 417.

Recognitions: 2013 ENR Southeast 'Best Projects' in Highways/Bridges.

Contractor: The Lane Construction Corporation (U.S. subsidiary of the Webuild Group)

Client: Central Florida Expressway Authority

SR 408/SR 417 Interchange Improvements, Florida

Information material - Bridge project over the Strait of Messina
(*) Required information