The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania


The most searched pages





The Webuild Group's websites
Discover all our websites: a digital ecosystem that tells the story of the world we have built in over 117 years of history
Webuild Group Main Companies

Discover the websites of the Webuild Group Main Companies

Milan's M4 Metro

Discover the new Milan's Metro Line Project mini website

Terzo Valico Project

Discover the Terzo Valico dei Giovi Project mini website

Genoa's Bridge Project

Discover the Genova San Giorgio Bridge Project mini website

Cantieri trasparenti

Discover the mini website of live webcams from Webuild's Italian construction sites

Webuild Australia

Discover the website of Webuild in Australia

Webuild Romania

Discover the website of Webuild in Romania



Go back

Bucharest Subway, Line 5

RAILWAYS AND SUBWAYS

#ROMANIA
#METRO SYSTEMS
Project's overview
Metros

Romania

Completed
Metropolitana di Bucarest, Linea 5

The project for Lot 1 (Raul Doamnei Station-PS Opera shaft) of Bucharest Subway, Line 5 foresaw construction of 12.5 kilometres (2 lines of 6.22 km each) of new line running completely underground and built using a EPB TBM, along the Drumul Taberei-Pantelimon section. The line is designed featuring 9 stations (total length: 1,372 m) and a double track tunnel (823m). 

The underground stations are located in correspondence with streets served by surface public transportation or streets of major local importance to permit an easy transfer between underground and surface transportation. 

Connection with the existing underground network is ensured at the Eroilor station, by means of a pedestrian underpass: passengers on underground line 5 will have direct access to lines 1 and 3 of the underground, and a supplementary transfer to lines 2 and 4 of the underground.
 

Technical data

+ + +

Concrete (m3) 

+ + +

Steel (tons)

+ + +

Underground excavations (m3)

Sustainable KPI

+ + +

Avoided C02 emissions (kg/day)

+ + +

Avoided nox emissions (kg/day)

+ + +

Avoided volatile organic compounds emissions (kg/day)