November 16, 2026

Webuild selected as successful proponent for Gabba Entertainment and Housing Precinct as part of Gather Brisbane Consortium

Value at approximately au$1.4 billion (€860 million) 

Webuild to design and build a new 17,000-seat indoor arena at heart of broader urban transformation program in Queensland, set to host events during Brisbane 2032 Olympic and Paralympic Games
Webuild further strengthens presence in Australia and reinforces position in sports and major events infrastructure sector
 

MILAN, November 16, 2026 – Webuild, as part of the Gather Brisbane consortium alongside Plenary Group, Live Nation and Oak View Group, has been selected as successful proponent by the Queensland Government to deliver the Gabba Entertainment and Housing Precinct project in Brisbane. Webuild will design and build the Gabba West Arena, a landmark sports and entertainment hub in the heart of the Australian city. The value is approximately AU$1.4 billion (€860 million). Construction is expected to commence in early-2027.

The development will create a world-class multifunctional destination in the Woolloongabba. At the centre of the project will be a new 17,000-seat indoor arena, centrally-located and purpose-designed for entertainment and sport, with capacity for up to 18,700 people in concert mode and the flexibility to host major concerts and sporting events, including competitions during the Brisbane 2032 Olympic and Paralympic Games.

From a technological standpoint, Webuild's proposal is based on advanced engineering solutions, including prefabricated structural elements, modular façade systems and long-span steel structures, aimed at optimising delivery timelines, construction quality and schedule certainty.

The Brisbane project further consolidates Webuild's presence in Australia, the Group's leading overseas market, where it also operates through its Australian subsidiary Clough. Major projects underway include Snowy 2.0, the largest renewable energy project under construction in the country, as well as Melbourne's North East Link and Suburban Rail Loop East. 

The project also strengthens the Group's international positioning in the sports infrastructure sector, an increasingly important component of urban regeneration and economic development programs worldwide. In this field, Webuild boasts a track record that includes the construction of the Al Bayt Stadium in Qatar, one of the landmark venues of the FIFA World Cup Qatar 2022™, and the Lia Manoliu National Stadium in Bucharest, Romania, which hosted the 2012 UEFA Europa League Final. The Group has delivered other infrastructure supporting major international events, such as Milan Metro’s Line 4, which connects the city centre with Linate Airport, improving urban accessibility ahead of the Milano Cortina 2026 Olympic and Paralympic Winter Games.

Gabba West Arena, Brisbane, Render

Webuild selected as successful proponent for Gabba Entertainment and Housing Precinct
Information material - Bridge project over the Strait of Messina
(*) Required information
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.