Control tower Fiumicino International Airport
The project involved the reconstruction and rehabilitation of the structure layout redistribution of the equipment for CAV and TWR; total restoration of the water, sanitary, thermic and electric air conditioning, fire fighting and security systems; reinstatement of the TLC, Marconi and ASMI equipment. Supply and installation of the security night-flight assistance equipment.